  • Project name
    Bridge Monitoring Project in Xiaoshan
  • Project Background
    During the Fengqing Avenue reconstruction, some bridge pile foundations traverse extensive karst-developed areas. Post-construction, vehicle loads may reduce pile-end bearing capacity, causing deformation, settlement, tilting, or even collapse of piers, jeopardizing bridge safety.
     Project Background
  • Project Solution
    Using visual deformation instrument, dual-axis inclinometers, and draw-wire displacement sensors, the project monitors pier settlement, tilt, and ramp lateral displacement across nine viaduct sections in karst areas. A smart bridge safety monitoring platform enables real-time disease detection, early warning, and comprehensive risk analysis.
  • Project Outcomes
    By real-time monitoring of bridge structural safety in karst areas, the project comprehensively captures disease information, identifies anomalies promptly, and issues risk warnings. This effectively prevents hazards like settlement, tilting, or collapse, ensuring the safe operation of viaducts.
Need help? We provide solutions for you.

400-119-1899

7×24 - hour service hotline

Company Address

Floor 8-11, Building 5, No. 8-5, Keji Avenue, Yuhang Street, Yuhang District, Hangzhou City, Zhejiang Province

Follow Us

RUHRloT

Follow the public number

RUHRloT

Copyright © 2025 杭州鲁尔物联科技有限公司 All Right Reserved 浙公网安备33011002013032号 浙ICP备13032182号-1 Sitemap