Home Application Cases Transportation Slope Monitoring and Early Warning Project in Hangxinjing Expressway
  • Project name
    Slope Monitoring and Early Warning Project in Hangxinjing Expressway
  • Project Background
    The high slope of the Qili connecting line of the Hangxinjing Expressway was excavated in 2014, and during construction, parts of the mountain road had through-type slipping, posing a significant safety risk.
     Project Background
  • Project Solution
    Through the construction of the integrated monitoring system for bridges, tunnels and slopes, data monitoring, diagnostic analysis and reporting were carried out. A total of 63 monitoring points were arranged on site to realize all-weather automatic professional monitoring.
  • Project Outcomes
    The high slope of the Qili connecting line is a large-scale slope in Zhejiang Province, featuring a comprehensive automated monitoring system with advanced monitoring technology, making it highly representative in Zhejiang Province. Since monitoring began in December, 2015, the stable output of monitoring data has effectively reduced the cost of management and verified the effectiveness of the management measures.
Need help? We provide solutions for you.

400-119-1899

7×24 - hour service hotline

Company Address

Floor 8-11, Building 5, No. 8-5, Keji Avenue, Yuhang Street, Yuhang District, Hangzhou City, Zhejiang Province

Follow Us

RUHRloT

Follow the public number

RUHRloT

Copyright © 2025 杭州鲁尔物联科技有限公司 All Right Reserved 浙公网安备33011002013032号 浙ICP备13032182号-1 Sitemap